Case: Safety Harbor
Safety Harbor Sewer Inspection

Long run of 4" Pipe which consisted of a total of 3 "bellies". With the introduction of flushable wipes, thick toilet paper or paper towels, this line is consistently backing up. By changing the type of toilet paper used, and refraining from using flushable wipes of any kind, this line may not need to be excavated to repair the bellies.









